Repository navigation
docs(releasing): deploy production manually with the rolling strategy - #47
Merged
Merged
Upsun Dispatch / Upsun Dispatch™ Code Review
succeeded
Nov 17, 2026 in 22s
No issues found
full · 1 file reviewed · no issues found
Verification
- The new intro says both environments use manual deployments, and step 3 now runs
upsun environment:deployafter the push to match that. - Step 3 uses the same
-p <project-id> -e <env>flags and placeholder as the staging deploy in step 2, so the two steps read the same way. - Nothing else in the repository's markdown (README.md, CLAUDE.md) describes deployment in a way that disagrees with the updated RELEASING.md.
This PR only changes documentation, and no test or CI job checks it. Whether --strategy=rolling behaves as described, and whether it needs the maintenance window, depends on the Upsun CLI and project settings. I couldn't check either from the repository.
Review details
- Commit: 5267c07
- Model: claude-opus-5-5
Loading