Skip to content

Update module github.com/emicklei/go-restful/v3 to v3.13.0#223

Open
red-hat-konflux-kflux-prd-rh03[bot] wants to merge 1 commit into
masterfrom
konflux/mintmaker/master/github.com-emicklei-go-restful-v3-3.x
Open

Update module github.com/emicklei/go-restful/v3 to v3.13.0#223
red-hat-konflux-kflux-prd-rh03[bot] wants to merge 1 commit into
masterfrom
konflux/mintmaker/master/github.com-emicklei-go-restful-v3-3.x

Update module github.com/emicklei/go-restful/v3 to v3.13.0

c94ee8f
Select commit
Loading
Failed to load commit list.
Red Hat Konflux kflux-prd-rh03 / Konflux kflux-prd-rh03 / ocm-agent-e2e-on-pull-request failed Apr 22, 2026 in 1h 59m 59s

Failed

Konflux kflux-prd-rh03/ocm-agent-e2e-on-pull-request has failed.

Details


Task Statuses:

StatusDurationName
🟢 Succeeded 5 seconds

init

🟢 Succeeded 7 seconds

clone-repository

🟢 Succeeded 9 seconds

prefetch-dependencies

🔴 Failed 0 seconds

build-container


Failure snippet:

task build-container has the status "TaskRunCancelled":
TaskRun "ocm-agent-e2e-on-pull-request-v7nxx-build-container" was cancelled. TaskRun cancelled as the PipelineRun it belongs to has timed out.