Skip to content

chore(deps) Update dependency strip-bom to v5#875

Open
renovate[bot] wants to merge 1 commit into
masterfrom
renovate/strip-bom-5.x
Open

chore(deps) Update dependency strip-bom to v5#875
renovate[bot] wants to merge 1 commit into
masterfrom
renovate/strip-bom-5.x

chore(deps) Update dependency strip-bom to v5

7e06fce
Select commit
Loading
Failed to load commit list.
Azure Pipelines / commitizen.cz-cli failed Jun 12, 2026 in 20m 8s

Build #20260612.63 failed

Details

Code coverage

  • 117 of 143 branches covered (81.82%)
  • 171 of 204 lines covered (83.82%)

Annotations

Check failure on line 82 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / commitizen.cz-cli

Build log #L82

Cmd.exe exited with code '1'.

Check failure on line 83 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / commitizen.cz-cli

Build log #L83

Bash exited with code '1'.

Check failure on line 83 in Build log

See this annotation in the file changed.

@azure-pipelines azure-pipelines / commitizen.cz-cli

Build log #L83

Bash exited with code '1'.