Frame Shift Module to Correct Timing in Data - PR For Spring Production - #560
Frame Shift Module to Correct Timing in Data - PR For Spring Production#560VCLanNguyen wants to merge 21 commits into
Conversation
…using information stored in PMTBeamSignal
sbncode v10_06_00_04 for larsoft v10_06_00_02
Add PMT Beam Signal timing to ICARUS CAFs
…weightType Update explicit references to 'EventWeightParameterSet::kMultisim'
sbncode v10_09_00 for larsoft v10_09_00
|
trigger build ci_ref=v10_06_02 LArSoft/larsoft@LARSOFT_SUITE_v10_06_00_01 LArSoft/larwirecell@LARSOFT_SUITE_v10_06_00_01 LArSoft/lar*@LARSOFT_SUITE_v10_06_00 SBNSoftware/sbnanaobj#152 SBNSoftware/sbndcode@v10_06_03 SBNSoftware/sbncode@v10_06_00_02 SBNSoftware/sbnalg@v10_06_00_02 SBNSoftware/sbnobj@v10_01_00 SBNSoftware/sbndata@v01_07 SBNSoftware/sbndaq_artdaq_core@v1_10_06 |
|
✔️ CI build for LArSoft Succeeded on slf7 for c14:prof -- details available through the CI dashboard |
|
✔️ CI build for LArSoft Succeeded on slf7 for e26:prof -- details available through the CI dashboard |
|
❌ CI build for SBND Failed at phase build SBND on slf7 for c14:prof -- details available through the CI dashboard 🚨 For more details about the failed phase, check the build SBND phase logs parent CI build details are available through the CI dashboard |
|
❌ CI build for ICARUS Failed at phase build ICARUS on slf7 for c14:prof -- details available through the CI dashboard 🚨 For more details about the failed phase, check the build ICARUS phase logs parent CI build details are available through the CI dashboard |
|
❌ CI build for SBND Failed at phase build SBND on slf7 for e26:prof -- details available through the CI dashboard 🚨 For more details about the failed phase, check the build SBND phase logs parent CI build details are available through the CI dashboard |
|
❌ CI build for ICARUS Failed at phase build ICARUS on slf7 for e26:prof -- details available through the CI dashboard 🚨 For more details about the failed phase, check the build ICARUS phase logs parent CI build details are available through the CI dashboard |
Description
New module for timing reconstruction in introduced at reco2 in sbndcode.
Module make data products that are saved in CAF as new Standard Record products.
Data Timing variables in CAF, i.e. crt space point time, sbnd crt track time, opflash and opt0, are shifted for beam spill reconstruction.
Full description can be found in docdb: https://sbn-docdb.fnal.gov/cgi-bin/sso/RetrieveFile?docid=43090
SBNSoftware/sbndcode#801
SBNSoftware/sbndcode#799
SBNSoftware/sbnanaobj#150
SBNSoftware/sbnanaobj#152