Skip to content

Latest commit

 

History

History
55 lines (47 loc) · 3.03 KB

projects.md

File metadata and controls

55 lines (47 loc) · 3.03 KB

GitHub Projects

Canonical map of the organization's public planning surfaces. Every issue in every HorneroOS repository belongs to at least the umbrella Roadmap project; specialized projects carry detail. Projects are planning surfaces, not sources of truth: status lives on issues, taxonomy in labels.yml, product truth in the owning repo.

The five projects

Project Scope Owns detail for
1 · HorneroOS Installer Installation outcomes and acceptance; transition to Panda Foss's official installer installer + blocking cross-repo work
2 · HorneroOS Roadmap Umbrella: every organization issue (open and closed), grouped by M0–M5 milestone cross-repo sequencing against hornero#154
3 · HorneroOS Shell & Desktop Desktop experience shell, greeter, config issues
4 · HorneroOS Platform & Release Core platform, releases, acceptance hornero, qa issues
5 · HorneroOS Docs, Web & Governance Handbook, website, org governance docs, website, .github issues

The personal ulises-jeremias/dotfiles repo is out of scope: it is not an organization repository.

Shared conventions (mirroring project 1)

  • Fields: Status (Todo, Ready, In Progress, In Review, Blocked, Done), Horizon (Now, Next, Later), Workstream (per-project vocabulary in each project README). Built-in Repository, Labels, Milestone, and linked-PR fields stay authoritative.
  • Horizon is triage order, not a date: Now blocks a trustworthy product path, Next is the next accepted outcome, Later has no immediate dependency. Initial value derives from the priority label (high → Now, medium → Next, low → Later).
  • Views: each project keeps All items plus Roadmap (table; group by Horizon in the UI) and Execution (board; group by Status in the UI). View grouping is not exposed by the GitHub API, so grouping is set once in the UI when a project is created — check it after creating a new project.
  • Coverage rule: a new issue must be added to the Roadmap (#2) and its specialized project in the same triage pass. Installer-affecting work also goes to project #1. Prefer adding the existing issue over creating duplicate cards.
  • No second truths: do not record acceptance, versions, or decisions only on a card. Link the issue/PR that proves them.

Maintenance

  • Maintainers set Status/Horizon during triage; closed issues move to Done (built-in workflows may do this automatically where enabled).
  • When a repository or milestone line is created, extend this map and the relevant project README in the same PR.
  • Periodically verify coverage: every open issue in the org should appear in project #2 and its specialized project (closed issues remain in #2 as history).