Skip to content

Integration Tests #121949

Integration Tests

Integration Tests #121949

Triggered via pull request July 21, 2026 10:14
Status Failure
Total duration 4m 54s
Artifacts

integration-tests.yml

on: pull_request
run-ccip-v1-6-e2e-tests  /  Check test configurations
run-ccip-v1-6-e2e-tests / Check test configurations
Matrix: Run Core CRE E2E Regression Tests / run-system-tests
Waiting for pending jobs
Matrix: Run Core CRE E2E Tests / run-system-tests
Waiting for pending jobs
Matrix: run-ccip-v1-6-e2e-tests / run-in-memory-tests
Waiting for pending jobs
run-ccip-v1-6-e2e-tests  /  Get remote runner test image
run-ccip-v1-6-e2e-tests / Get remote runner test image
run-ccip-v1-6-e2e-tests  /  After tests
run-ccip-v1-6-e2e-tests / After tests
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 3 warnings
Build Chainlink Image (plugins)
buildx failed with: ERROR: failed to build: failed to solve: process "/bin/sh -c mkdir -p /gobins && if [ \"$CL_IS_PROD_BUILD\" = \"false\" ]; then GOBIN=/gobins make install-chainlink-dev; else GOBIN=/gobins make install-chainlink; fi" did not complete successfully: exit code: 2
Build Chainlink Image
The strategy configuration was canceled because "build-chainlink._plugins__runs-on_2982145" failed
Build Chainlink Image
The operation was canceled.
ETH Smoke Tests
Process completed with exit code 1.
ETH Smoke Tests
Chainlink image build failed.
ETH Smoke Tests
Core CRE E2E regression tests were skipped.
ETH Smoke Tests
Core CRE E2E tests were skipped.
ETH Smoke Tests
CCIP v1.6 E2E tests were skipped.