docs: correct three ADR 0018 review-notes claims taken from the text layer
A third reading of the source package, from rendered page images rather
than extracted text, found three wrong claims in the review notes. All
three failed the same way: in this package the PDF text layer misplaces
checkbox and Y/N columns, collapsing marks upward toward the first rows
of a table and detaching answer columns from their items, so a filled
form reads as a mostly-empty one.
- The package is 73 pages, not 24. 24 was the tooling's page count.
- One vendor's pump checklist has 3 of 20 items blank, not 14 - items
6, 12 and 20. Rotation direction and power consumption are both
marked and initialled. Adds the genuine finding the wrong number was
obscuring: the Date column is blank on all twenty rows of all four
copies, so nothing on the form dates an individual check.
- The hard N is not the PID-tuning line, which is marked pass with a
note describing a defect and a workaround - that is an instance of
R3, not R4. The real orphan failure is the line confirming automatic
recovery from simulated power-loss events.
The third correction reaches into the ADR: open question 7 was built on
the PID example. The real line is a stronger case - empty note cell,
arguably the most consequential line on the page, and the page was
signed as a whole immediately afterwards with the failure on it. That
sharpens where the QC flag belongs: at sign/freeze time alongside
section 4's blank-result gate, not in the turnover package, which is
far too late. A failed line with no linked punch item is the same class
of defect as a blank line - one whose consequence has nowhere to go.
Nothing structural changes. The ten observations hold, R2/R6/R7/R8
stand, R3-R5 remain open. Corrections are marked in place rather than
silently applied, per this file's own rule.
service order (×2 units), a valve-actuator vendor's inspection reports (×6
29
29
units), an MBR system supplier's three field service reports (dry checks, I/O
30
30
checks, clean water), and three clean-water checklists including a pre-run gate.
31
31
No project, company, or person is identified in these notes.
32
32
33
+
**Corrections — third reading, 2026-08-04.** Three claims in these notes were
34
+
wrong, and all three failed the same way: they were taken from the PDF's
35
+
**extracted text layer** rather than from rendered pages. In this package the
36
+
text layer misplaces checkbox and Y/N columns — marks collapse upward toward
37
+
the first rows of a table, and answer columns detach from their items — so a
38
+
filled form reads as a mostly-empty one. The source was re-read from rendered
39
+
page images and the corrections are marked at each site below.
40
+
41
+
| Claim as written | Correct | Where |
42
+
|---|---|---|
43
+
| "A 24-page compiled startup submittal" |**73 pages** — 24 was the tooling's page count, not the file's | fixed above |
44
+
| "14 of 20 checklist items blank on all four copies … including rotation direction and power consumption" |**3 of 20** — items 6, 12 and 20. Rotation direction (item 7) and power consumption (item 19) are both marked and initialled | §4 row in the confirmation table |
45
+
| "one clean-water logic line is answered a hard **N** — a PID loop not tuned" | The PID line is marked **Y**. The **N** is the line covering **automatic recovery from simulated power-loss events**| R4 |
46
+
47
+
The third correction is the one that matters beyond accuracy: **ADR 0018's open
48
+
question 7 is built on that example**, and the real line is both more
49
+
consequential and a cleaner illustration of the point. It is corrected there
50
+
too.
51
+
52
+
Nothing structural changes. The ten observations still hold, R2 / R6 / R7 / R8
53
+
stand as folded in, and R3–R5 remain open. Method note for whoever reads a
54
+
scanned or form-heavy source next: **render the pages.** A text layer is a
55
+
convenience, not the document.
56
+
33
57
---
34
58
35
59
## R1 — Per-leg readings: the ADR's recommendation is **reversed** · **DECIDED — original recommendation upheld**
@@ -152,11 +176,25 @@ them. That is not `deferred` (nothing was moved to a later phase, and no
152
176
follow-up was named), not `na` (the check applies), and not `fail`. It is
153
177
"not performed, because the plant could not be put in the state required."
154
178
155
-
Separately, one clean-water logic line is answered a hard **N** — a PID loop
156
-
not tuned — and appears in **no** action-item list in the package. A bare `fail`
179
+
Separately, one clean-water logic line is answered a hard **N** — ~~a PID loop
180
+
not tuned~~**corrected: the line confirming that the system recovers
181
+
automatically from simulated power-loss events, with no manual operator
182
+
action** — and appears in **no** action-item list in the package. A bare `fail`
157
183
with no punch item is exactly the leak the ball-in-court work is meant to close
158
184
(see R5's neighbour finding below).
159
185
186
+
**Correction, third reading 2026-08-04.** The PID line is marked **Y**, not N;
187
+
its *note* describes an unresolved equipment defect and prescribes a speed
188
+
limit as a workaround, which makes it an instance of **R3** (pass with
189
+
exception), not of this comment. The genuine bare failure is the power-loss
190
+
recovery line, and it is a stronger example in three ways: its note cell is
191
+
**empty**, so there is no prose for a reader to fall back on; it is arguably
192
+
the most consequential line on the page; and the page was **signed as a whole**
193
+
immediately afterwards. That last point sharpens the recommendation below — the
194
+
QC flag has to fire at **sign/freeze** time, not only in the turnover package,
195
+
because a signature over a set of lines is plainly not a signature over their
196
+
content.
197
+
160
198
**Recommendation:** a short closed vocabulary on `not_performed` —
`out_of_scope` · `other` — is cheap and makes the turnover package answer
@@ -246,7 +284,7 @@ assumed:
246
284
| ADR section | Source evidence |
247
285
|---|---|
248
286
| §2 deferral | Two "will be checked during clean water with [vendor] rep" annotations, plus one "finish during clean water" |
249
-
| §4 blanks | 14 of 20checklist items blank on **all four** copies of one vendor's pump form, including rotation direction and power consumption |
287
+
| §4 blanks |~~14 of 20~~**3 of 20**checklist items blank on **all four** copies of one vendor's pump form — items 6, 12 and 20 (optional safety equipment, air relieved from piping, and the O&M inspection schedule: plausibly N/A, definitely-performed-or-not, and a deliverable rather than a field check — three meanings, one blank cell). Rotation direction and power consumption are both marked and initialled. Separately, the form's **Date column is blank on all twenty rows** of all four copies; only initials were entered, so nothing on the form dates an individual check|
250
288
| §5 vendor evidence | Five vendors, five incompatible formats, one of them a seven-page service order with on-site/off-site times **and break duration**|
251
289
| §6 ball-in-court | The MBR supplier's reports are *organized* by responsible party — three standing sections per report |
252
290
| §6 scope gap | Three separate instances, including an instrument explicitly "not in scope but would need to be set up before turning plant online" |