Architecture decision backlog

These are unresolved decisions, not implementation tasks. Recommendations are provisional and every row identifies the latest point at which delay remains safe.

1. Which product owns service cutover? — RESOLVED (2026-07-18)

  • Resolution: LoopCheck, permanently (DECISIONS.md D9). Service cutover — notice through restoration — is not moving to any sibling. ADR 0006 and the shipped UI stay authoritative, and LoopCheck may continue to evolve service semantics.
  • Note on the earlier framing: this question originally assumed linear service acceptance would move to LineCheck. LineCheck is archived, and the scope that did move (segment/linear acceptance only — see question 2) went to MainLine. Service was never part of that move.

2. Should LoopCheck continue Phase 6 segment work? — RESOLVED (2026-07-18)

  • Resolution: No. Linear/segment acceptance is not LoopCheck's bounded context; it belongs to MainLine as an unscheduled future module (DECISIONS.md D10), because MainLine already models alignments, stations, and append-only test ledgers with derived acceptance. LoopCheck stops at the landed schema (frozen, maintenance-only — the shipped migrations stay, not ripped out); no segment execution UI, import, or route is built in LoopCheck. ADR 0014 is superseded and records this.
  • Migration: none planned. Cross-product record migrations are frozen until there are real users.
  • Note on the decision path: the move was briefly assigned to LineCheck (2026-07-14) before LineCheck was archived; that assignment is historical.

3. Where does equipment preservation change ownership?

  • Why it matters: storage preservation fits TrenchNote; installed-equipment layup may fit LoopCheck; warranty evidence must not split invisibly.
  • Options: all TrenchNote; all LoopCheck; custody-triggered handoff.
  • Current evidence: an untracked LoopCheck ADR proposes a recurring tag log; no implementation exists; intended TrenchNote boundary includes preservation.
  • Recommendation: custody-triggered handoff, validated against real specs and who signs the record.
  • Validate: manufacturer requirements, job responsibility, tag availability before installation, and warranty dispute needs.
  • Decision owner: Maintainer/domain expert.
  • Latest safe decision point: before accepting ADR 0015 or seeding a preservation template.

4. What is the portable identity scheme?

  • Why it matters: local PocketBase ids and project names cannot safely join independently deployed databases.
  • Options: UUID/ULID public ids issued by each producer; namespaced compound ids; externally assigned owner/project ids with local fallback.
  • Current evidence: LoopCheck tag numbers are project-scoped; services and segments use local ids in URLs; no ecosystem deployment id exists.
  • Recommendation: producer-issued opaque public ids plus preserved business ids and explicit project/source deployment references.
  • Validate: offline creation, collision handling, printed QR compatibility, operator cloning/restores, and human reconciliation.
  • Decision owner: Cross-product architecture owner.
  • Latest safe decision point: before the first versioned handoff or import.

5. Is ADR 0010 ready to accept and land? — RESOLVED (2026-08-04)

  • Resolution: Yes — ADR 0010 is Accepted (DECISIONS D26). Acceptance covers the design (frozen snapshot, canonical hash, supersession, attestation model). It does not perform the D12 contract bump; the two collections stay delta; ADR 0010 in docs/API.md until M3.
  • What the investigation found: two of D6's three gates were already met and merely unrecorded (the on-page "not a qualified e-signature" wording ships in sign.html and turnover.html; required-role semantics are ADR 0018 §9). The third — "independent verification … tested," which this question's own recommendation demanded — was not met and had been assumed to be: the golden vector was a console.log at hook load. On drift it printed one line to an unread console and kept sealing packages with unreproducible hashes.
  • Closed by fixing it, not by lowering the bar: the vector is now enforced at POST /api/turnover/build (which refuses on mismatch) and asserted by scripts/smoke_test.sh — pinned algo, digest shape, hash determinism across a rebuild, supersession. The refusal path was verified by deliberately drifting the vector.
  • Still open beside it: question 9 (minimum free turnover artifact) is no longer blocked by this one, but is not decided by it either.

Original framing (retained)

  • Why it matters: staged signature/turnover code implements a Proposed ADR; hashes and attestations become hard to change after records exist.
  • Options: accept as drafted; revise manifest/hash/auth semantics; defer.
  • Current evidence: staged collections/hooks/pages exist, but ADR 0010 review notes retain open issues and no committed golden-vector test was found.
  • Recommendation: pause commit until canonicalization, file coverage, identity/auth, supersession, required roles, and independent verification are approved and tested.
  • Validate: golden vectors across implementations, tamper cases, package completeness, Pi performance, and legal wording.
  • Decision owner: Maintainer with legal/domain review as appropriate.
  • Latest safe decision point: before the first signature/package migration reaches a persistent database.

6. What is the authoritative auth access matrix? — RESOLVED (2026-07-20)

  • Resolution: ADR 0011 is Accepted. The narrow accountless flows are preserved (public scan/reads; accountless check/punch-flag/LOTO/calibration creates); every other write and all office/PII reads require an account. Migration 1789000033 closed the segment public-write gap. The office pages authenticate through lc-auth.js, and scripts/smoke_test.sh mechanically asserts the matrix across guest, user, and superuser tiers — including the field-level PII back-relation expand. The README/DEPLOY internet-exposure warning tied to this question has been removed.
  • Still tracked separately: the API v1 version bump for the added collections (question 7 below) — a contract-versioning decision, not an auth one.

7. How should API v1 be reconciled?

  • Why it matters: published contract v1 originally covered sixteen broadly permissive collections; committed code has 32 (16 v1 + 16 delta) and selective auth. The API document now exposes that delta but cannot approve its own version. The auth/PII half is settled (ADR 0011, Accepted); what remains open is the collection-set version bump, sequenced to M3 (D12).
  • Options: version bump for auth/PII changes; declare compatible v1 additions with corrected rules; temporarily exclude segments from contract.
  • Current evidence: ADR 0003 requires ADR + version bump for breaking changes; auth and removal of PII fields change client behavior.
  • Recommendation: publish a reviewed compatibility matrix and bump the contract for auth/PII semantics; decide segment status separately.
  • Validate: Bindery LoopCheck, seed scripts, public pages, third-party assumptions, and PocketBase REST behavior.
  • Decision owner: Maintainer/API owner.
  • Latest safe decision point: before the next tagged release or external integration commitment.

8. What general offline guarantee is required?

  • Why it matters: README-level field expectations can be mistaken for offline-first behavior; only LOTO has a durable queue/cache.
  • Options: online-required except LOTO; durable queue for selected field actions; full offline application shell and synchronization.
  • Current evidence: no service worker/IndexedDB; LOTO uses localStorage; notice batch is tab-local.
  • Recommendation: publish workflow-specific guarantees, then implement only the high-value queues with idempotency and explicit freshness.
  • Validate: browser storage limits, photo sizes, device loss, conflicts, duplicate append-only events, and auth expiry.
  • Decision owner: Maintainer/product owner.
  • Latest safe decision point: before marketing general offline capability or adding a second durable queue.

9. What is the minimum free turnover artifact?

  • Why it matters: the paid compiled binder cannot make paid software necessary to prove or retrieve core field work.
  • Options: browser-print HTML only; deterministic core PDF; manifest + HTML with paid compilation.
  • Current evidence: current deliverables use browser printing; ADR 0003 places advanced compilation in the paid sidecar; ADR 0010 proposes a free frozen package and print view.
  • Recommendation: guarantee a complete free manifest and readable print view; decide deterministic PDF based on owner requirements and Pi cost.
  • Validate: archival requirements, attachments, pagination, signatures, offline verification, and accessibility.
  • Decision owner: Maintainer/product owner.
  • Latest safe decision point: before accepting the turnover package ADR and marketing a Phase 3 deliverable.

10. What deployment topology is supported versus illustrative?

  • Why it matters: restore/replica claims affect evidence durability and operator expectations.
  • Options: support LAN and single VPS only; support VPS-primary/Pi replica; add managed topology in paid products.
  • Current evidence: deployment docs describe all three, but Pi hardware and replica validation are explicitly incomplete.
  • Recommendation: label single-host LAN/VPS as current documented options and replica/Pi performance as unvalidated until exercised.
  • Validate: fresh install, concurrent phones, backups/restores, power loss, file storage replication, schema upgrades, and recovery point.
  • Decision owner: Maintainer/operations owner.
  • Latest safe decision point: before calling Pi/replication production- supported or onboarding external operators.

Questions 11–13 came out of the 2026-08-04 review of field observations from a multi-vendor plant startup (ADR 0018, proposed). They gate the M4–M6 track, not M1–M3 — except #13, which is cheapest to answer immediately.

11. What is the right startup phase vocabulary?

  • Why it matters: the observed sequence (dry checks → I/O checks → clean water / wet-mech → seeding → performance) does not map cleanly onto the six committed checkout phases, and a tag's required phases derive from which templates exist per phase. Getting the vocabulary wrong means re-phasing seeded templates later, which re-derives standing for every existing record.
  • Options: add wet_commissioning + process_seeding only and map dry/IO checks onto the existing installation/energization/point_to_point/ loop_check; add distinct dry_check and io_check phases and re-phase the seeded library; leave the vocabulary alone and express the stages as additional templates within existing phases.
  • Current evidence: ADR 0018 §1 recommends the first option. The mechanical acceptance forms already set the precedent that a new form at an existing phase costs nothing, while a new phase changes every affected tag's derived denominator. Strengthened by the 2026-08-04 source reading: the package's own sequence is dry checks → I/O checks → clean water / wet-mech → seeding → performance, its dry-check report maps onto installation and its I/O-check report onto point_to_point + loop_check without strain, and seeding is recorded as a distinct not-yet-scheduled stage. That is the recommended option, observed.
  • Recommendation: the two additive phases; do not re-phase the library. This question is probably closeable on the maintainer's say-so alone.
  • Validate: against the maintainer's own phase sequence on a real job, and against whether any observed check has no honest home in the existing six.
  • Decision owner: Maintainer/domain expert.
  • Latest safe decision point: before the M4.1 enum-opening migration.

12. Does LoopCheck model the asset separately from the position? — RESOLVED (2026-08-04)

  • Resolution: No — no second identity. An append-only equipment_events ledger on the tag records that the physical machine changed (replaced / rebuilt / reinstalled / relocated / nameplate_corrected), with nullable serial_before / serial_after; a derived re-verify marker then flags any phase whose standing rests entirely on checks older than the tag's latest event. tags stays the only identity (ADR 0018 §16, DECISIONS D27). Sized as a scope item in M5.3.
  • What decided it: the serial-keyed asset model fails on contact with the source — actuator serial number reads "N/A" on all six valve reports, so an entire equipment class has no key. And the real requirement was never asset lifecycle; it is "a phase passed by a machine later pulled apart must not read as current," which is a derivation over dates.
  • Accepted loss: you cannot ask "where has serial X been installed over time," or follow one machine between positions. That is asset management and belongs elsewhere. If it ever matters, these events are the substrate the heavier model would be built on.

Original framing (retained)

  • Why it matters: a tag is a P&ID position; the serial-numbered machine is an asset that gets pulled, rebuilt, and reinstalled — possibly in a different position — mid-startup. Today they are the same record, so a phase passed in March by one machine reads identically to one passed by its replacement in May. The observed failure was one tag number appearing for two different valves in vendor paperwork, undetectable on paper.
  • Options: a new equipment_assets collection plus an append-only install/remove ledger (asset ↔ position over time); a lighter "nameplate changed on this tag" append-only event that triggers the re-verification prompt without a second identity; do nothing beyond the duplicate-serial and nameplate-mismatch warnings in M5.3.
  • Current evidence: ADR 0018 §11 deliberately defers this and lands only the cheap validation half, because a second identity touches every record that points at a tag — checks, punch items, warranties, LOTO, calibrations, settings, signatures. The 2026-08-04 source reading makes this live rather than hypothetical: the package records a pump found with a frozen impeller, removed, rebuilt with new seals, and re-installed — between the clean-water and seeding phases, with a standing action item to "confirm the pump re-build and installation." Every clean-water result logged against that position was produced by a different machine than the one that will run the plant.
  • Recommendation: decide the goal first (is the requirement really "re-verify after a swap", or is it full asset lifecycle?). If it is the former, the lighter event is probably sufficient and far cheaper.
  • Validate: what a turnover binder must show after a mid-startup swap; what the warranty clock does when the asset changes (ADR 0005's basis/trigger provenance); whether QR labels follow the position or the machine.
  • Decision owner: Maintainer/domain expert.
  • Latest safe decision point: before any equipment-asset work is scoped; it needs its own ADR either way.

13. Do ADR 0018's turnover additions land inside sha256-canon-v1? — RESOLVED (2026-08-04)

  • Resolution: Yes — one fold, inside sha256-canon-v1, no v2 (DECISIONS D25, ADR 0018 §15). A hash version exists to protect history and there is no history to protect; a v2 carrying additions no v1 package ever saw would be a boundary that records nothing. Partial folds are forbidden — each addition alone changes the canonical bytes.
  • Precondition, still live: confirm no turnover_packages record carrying real signatures exists on any live instance before the fold ships. If one does, the decision inverts to sha256-canon-v2.
  • Related, and now closed: the golden vector this decision leans on was a console.log, not a test. It is now enforced at the build route and asserted by scripts/smoke_test.sh (question 5, D26) — without which "regenerate the golden vector as the acceptance test" would have had nothing to regenerate.

Original framing (retained)

  • Why it matters: the vendor report index, the instrument settings table, the deferred-cell standing grid, the countersignature QC block, and the completeness assertion all enter the canonical bytes a package hashes. A hash scheme is evidence only if an independent party can recompute it, so changing what enters the bytes after real packages exist means those packages verify under a different scheme than new ones.
  • Options: fold the additions into sha256-canon-v1 before any real package is signed; accept ADR 0010 as-is now and plan sha256-canon-v2; freeze package building entirely until both ADRs are decided.
  • Current evidence: no real turnover package has been signed. ADR 0010 is Proposed and frozen (D6); its golden-vector and required-role gates are still open, and ADR 0018 §9 is the concrete proposal for the required-role gate.
  • Recommendation: fold first, decide with question #5, and accept the two ADRs together. This is the cheapest moment this decision will ever have.
  • Validate: golden vectors across the goja builder and the sidecar; whether a manifest carrying vendor reports and settings stays buildable on a Pi.
  • Decision owner: Maintainer/API owner.
  • Latest safe decision point: before the first real turnover package is signed — this is the one question here that gets more expensive with time rather than staying flat.