You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Tracks all work items from the strategy doc. This repo is the source of truth — update Status as work moves.
Phase 0 — Pre-Work (blockers: complete before publishing any content)
#
Task
Owner
Status
1
Pull Zendesk Extracted from Matt's retention discovery (docs/swim-lanes/retention/research/2026-03-26-support-data-findings.md)
Kat
✅ Done
2
Pull data Already in Brain: 56.2% of new Pros reach job 7 (11,685/20,796) — docs/swim-lanes/retention/cold-start-blue/rating-rate-first-10.md
Kat
✅ Done
3
Pull Bettermode baseline: active Pro count + current post view rate
Kat
✅ Done — data/bettermode-baseline.md
3a
Resolve Zendesk reporting access — confirm whether Kat can get a direct reporting seat; if not, identify who currently holds access after seat holder changes (Nicole and Patrick may no longer have it)
Kat → Dustin + Seth
⬜ Not started
Phase 1 — Focus Area 1: New Pro Success (First 60 Days)
Space Setup
#
Task
Notes
Status
7a
Design the First 60 Days space in Bettermode Design Studio
Added a space inside the existing Pro Academy space to house First 60 Days posts — space is designed and ready for content
✅ Done
7b
Activate hidden Bettermode space for First 60 Days
Space is live and visible to Pros — no content posted yet
✅ Done
Distribution — Braze Trigger
#
Task
Notes
Status
7d
Confirm feasibility with Callie — can Braze trigger a follow-up text with the First 60 Days space link after a new Pro joins the community?
Reached out to Callie — awaiting response
🔄 In progress
7e
If confirmed: implement Braze trigger — follow-up text with First 60 Days space link fires after new Pro joins community
Dependent on 7b (space must be live with a real link before this can be built)
⬜ Not started
Content
#
Task
Format
Priority
Status
7
Publish: "Getting your first job — what to expect, how the queue works"
Short post + 1 action
P1
✅ Published 4/30/2026
8
Publish: "Your first service — photos, long grass, completing correctly"
Short post + 1 action
P1
✅ Published 4/30/2026
9
Publish: "Understanding your tier score — what moves it, what doesn't"
Short post + 1 action
P1
✅ Published 4/30/2026
10
Publish: "Getting to Blue — what it means and how to get there"
Short post + 1 action
P1
✅ Published 4/30/2026
Dependencies: Tasks 7a and 7b before publishing any content. Tasks 1 and 2 must be complete before publishing — baselines needed for measurement.
Phase 2 — Focus Area 2: Field Guide
#
Task
Format
Priority
Status
11
Write + publish: Long grass — how to report it, document it, why photos matter
Field guide post
P1
🔄 In org review — drafts/task-11-long-grass.md
12
Write + publish: When the customer cancels on you — what to do right now
Field guide post
P1
🔄 In org review — drafts/task-12-customer-cancels.md
13
Write + publish: Unresponsive customer — step by step
Field guide post
P1
🔄 In org review — drafts/task-13-unresponsive-customer.md
14
Write + publish: Payment questions — timing, breakdowns, where to look
Field guide post
P2
✅ Done
15
Write + publish: What actually affects your completion rate
Field guide post
P2
🔄 In org review — drafts/task-14-completion-rate.md
16
Implement Zendesk reference doc: maps ticket type to Bettermode post link — requires Dustin and Seth to add and pin it in Zendesk; draft ready for their review at drafts/zendesk-bettermode-reference.md
Zendesk pinned doc
—
⬜ Not started
Zendesk reference doc (drafts/zendesk-bettermode-reference.md) must be updated with live links each time a Field Guide post is published.
Phase 3 — Focus Area 3: Tier Clarity
#
Task
Format
Priority
Status
17
Write + pin: Tiers and rewards explainer
Pinned post
P1
✅ Done — drafts/task-16-tiers-and-rewards.md
18
Set up milestone recognition system: Blue attainment celebration posts (opt-in)
Identify + confirm marketing rep — brief on GBP/Google reviews topics, get approval on intro draft
Topics: Google Business Profile, asking for reviews, local SEO, off-platform reputation
⬜ Not started
25
Confirm Pro peer participant — brief on likely questions, get approval on intro draft
First choice: Scott Culala (490 all-time replies, already acts as mentor organically); backup: Arely Elrod
⬜ Not started
25a
Confirm Callie and Vinicius (Gamification) — brief on support ticket pattern, get approval on their intro draft
Gamification questions currently bounce through Kat or Support before reaching them — this thread eliminates that routing
⬜ Not started
Month 1 — PE rep (Product & Engineering)
#
Task
Format
Status
26
Post PE rep AMA thread
Ask the Community — drafts/ama-product-engineering.md
⬜ Not started
27
Compile PE rep Q&As into FAQ post
Pro Academy — title: "You Asked, We Answered — [Month] with PE rep"
⬜ Not started
Month 2 — Pro Peer (Gold/Platinum)
#
Task
Format
Status
28
Post Pro Peer AMA thread
Ask the Community — drafts/ama-pro-peer.md
⬜ Not started
29
Compile Pro Peer Q&As into FAQ post
Pro Academy — title: "You Asked, They Answered — [Month] with [Pro], [Tier] Pro"
⬜ Not started
Month 3 — Marketing Rep
#
Task
Format
Status
30
Post Marketing AMA thread
Ask the Community — drafts/ama-marketing.md
⬜ Not started
31
Compile Marketing Q&As into FAQ post
Pro Academy — title: "You Asked, We Answered — [Month] with [rep], Marketing"
⬜ Not started
Month 4 — Steve (CEO)
#
Task
Format
Status
32
Post Steve AMA thread
Ask the Community — drafts/ama-steve-ceo.md
⬜ Not started
33
Compile Steve Q&As into FAQ post
Pro Academy — title: "You Asked, Steve Answered — [Month]"
⬜ Not started
Month 5 — Callie + Vinicius (Gamification)
#
Task
Format
Status
34a
Post Gamification AMA thread
Ask the Community — drafts/ama-gamification.md
⬜ Not started
34b
Compile Gamification Q&As into FAQ post
Pro Academy — title: "You Asked, We Answered — [Month] with Callie and Vinicius, Gamification"
⬜ Not started
Dependencies: Tasks 22–25a (confirmations) must be complete before their respective thread goes live. Each compile task follows its thread after 7–10 days or when activity slows.
Phase 6 — Focus Area 5: Pool Pro Space
Discovery
#
Task
Notes
Status
34
Meet with Trent M. — understand Pool Pro experience, pain points, questions
Trent is active in the main community (10 posts); first voice to consult before building anything
⬜ Not started
35
Pull sentiment from Will and Shannon — what themes and complaints come up most on the Pool Pro Facebook page
Facebook page is LawnStarter-run but not connected to Bettermode; this is untapped signal
⬜ Not started
36
Confirm with PE rep (PE): do pool Pro metrics work differently from lawn care Pro metrics?
Answer determines whether tier/metrics content needs to be written separately or can reuse existing posts
⬜ Not started
37
Review hidden Bettermode space — confirm what needs to change to activate it for Pool Pros
Check space settings, visibility, membership rules in Bettermode admin
⬜ Not started
37a
Connect with Jeff Herman's team — inventory what Pool Pro content is available or in progress to feature in the space
Jeff's team is actively producing Pool Pro content; coordinate so the space surfaces their work rather than duplicating it
⬜ Not started
Build (pending discovery)
#
Task
Notes
Status
38
Activate and configure the Pool Pro space in Bettermode
Scope determined by tasks 34–37
⬜ Not started
39
Write initial Pool Pro content — topics TBD from discovery
At minimum: welcome post, one field guide equivalent, metrics/tier clarity if needed
⬜ Not started
Dependencies: Tasks 34–37 must be complete before 38–39. Do not build before discovery is done.
Notes
"Draft done" ≠ published. All content marked Draft done still needs to go through the full publishing workflow before it goes live. See drafts/content-publishing-workflow.md for all 8 steps: fact check → tone pass (AI tool) → Bettermode formatting → 7-day org review → edits → asset creation (if needed) → publish.
Phase 1 space setup (7a–7b) is complete. Space is live and ready for content — First 60 Days posts (7–10) publish 4/30/2026.
Braze trigger (7d–7e) is a dependency on Callie — confirm feasibility before building anything.
Field Guide posts (11–15) are drafted and ready. Update the Zendesk reference doc (drafts/zendesk-bettermode-reference.md) with the live link each time one is published.
AMA confirmations (22–25) gate their respective threads — nothing goes live without the participant's approval on their intro draft.
Pool Pro space (34–39) is discovery-first — do not build before tasks 34–37 are complete.
After any content is published: update data/bettermode-content-tracker.md with the live link and status.
Update the Status column as tasks move: ⬜ Not started → 🔄 In progress → ✅ Draft done → ✅ Published
OST — Tentative drafts (10 posts) are in drafts/ with (Tentative) in the title. Sourced from the Pro Discovery Opportunity Solution Tree. Not yet in the publishing workflow — pending team review. See drafts/content-publishing-workflow.md for full list.