Skip to content

Commit 3ee0baf

Browse files
zzylolclaude
andcommitted
docs: Stage 3 cost model design doc
Scope of the Stage 3 planning model for designers: what is priced, the per-second basis for ingestion-time and query-time nodes, recurrence and horizon, the memory term (1.25e-7 cost/(byte·s), 1 GB ≈ 1/8 vCPU) and its configuration, illustrative default statistics, interaction with the tree DP and shared nodes (one node, one computation; "not materialized" is Stage 2 duplicating the node), a worked Example 1 table, and what is out of scope. Linked from the proposals README and #509 Stage 3. The Example 1 acceptance doc's costs are restated per second. Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
1 parent 0ec8328 commit 3ee0baf

4 files changed

Lines changed: 255 additions & 47 deletions

File tree

‎docs/design_docs/proposals/README.md‎

Lines changed: 1 addition & 0 deletions
Original file line numberDiff line numberDiff line change
@@ -11,3 +11,4 @@ extensions. A design document is not a promise of downstream runtime support.
1111
- [Operator sharing](operator-sharing.md)
1212
- [Decoupling operators from scalar expressions](decoupling_op_and_expr.md)
1313
- [ASAPPlanner layering](planner-layering.md)
14+
- [Stage 3 cost model](stage3-cost-model.md)

0 commit comments

Comments
 (0)