Skip to content

Fix linter complaints. #8

Fix linter complaints.

Fix linter complaints. #8

Triggered via push January 10, 2026 14:14
Status Failure
Total duration 1m 41s
Artifacts

test.yml

on: push
Matrix: test
Fit to window
Zoom out
Zoom in

Annotations

5 errors
test (3.11)
Process completed with exit code 1.
test (3.10)
The strategy configuration was canceled because "test._3_11" failed
test (3.10)
Process completed with exit code 1.
test (3.12)
The strategy configuration was canceled because "test._3_11" failed
test (3.12)
The operation was canceled.